Metallurgical Viability, Inc.

robert@metallurgicalviability.com or

al@metallurgicalviability.com

 

Home .......

Services

Rates

Policies

News/ Prospects

 Process ....  Engineering..

PFD Examples

Copper Refinery Waste Water Treatment

Synthetic Cu2O Mill Scale

Solar Grade Si

Nozzle-Based Magnesium Process

 

 

 Other,,,,

Beta Test TaskMaster Software

 

Failure Analysis of Chemical Process Equipment

  • Onsite Investigations to Gather Data Related to the Failure
  • Or, alternatively use data from a detailed questionnaire
  • Analysis of Operating Conditions vs. Design
  • Laboratory Characterization of the Failure, the Traditional Failure Analysis
  • Chemical Analysis of Residues to Identify Corrodents

The Goal of the Investigation could include:

  • Identification of the Corrosion Mechanism from the Preponderance of the Evidence
  • Identification the Root Cause of the Failure
  • Find the most Cost Effective Solution or perhaps the Most Expedient Solution

     

    Recommended Corrective Action could include:

    • Reducing the Corrosivity of the Process Through Improved Process Control or Process Modification
    • Alternative Materials of Construction
    • Improved Use of Inhibitors
    • Monitoring of Corrosive Conditions with Electrochemical Probes or Corrosion Coupons
    • Field Measurement of the Rate of Corrosion with Electrochemical Probes

     

    Post Audits to Determine the Effectiveness of Corrective Action

    • In Improving the Operability of the Equipment
    • In reducing the corrosion
    • In Improving the Profitability of the Process
    • In the actual Cost Effectiveness of the Solution
    • In correcting the Root Cause

     Quick Response

  • Preliminary Photos, Opinions, and Summary within 3 days
  • Rough Draft of Report Posted On-line Within One Week (Secure site with password protection)
  • Final Report Three Days after Rough Draft Reviewed by You.

     

    Long-Term Part-Time Corrosion Engineers

 

Failure ...... Analysis......

 

Free Evaluation

Investigations

Root Cause Investigations Article

FA Questions

Industries

Failure Analysis Questionnaire

 ..Corrosion....

Under-Deposit Corrosion

SCC

Technical Briefing Denickelification

Failure Analysis of Cupro-Nickel Tube

Pitting

Crevice Corrosion

 

Metallurgical Viability, Inc. 

443-616-4339 or robert@metallurgicalviability.com

Serving Maryland, Delaware, Pennsylvania, New Jersey, New York, Virginia, West Virginia